Santa Maria Drainage
- Project Type: Transportation
- Sub-Project Type: Drainage
- Design Year: 2008
- Client: St. Johns County Public Works – Engineering Division
- Address: St. Augustine, FL
Connelly & Wicker | PRIME AE was responsible for an analysis and redesign of a storm sewer system that was showing signs of failure and requiring recurring maintenance repairs. After performing TV video inspection of the existing system, viable solutions were developed and construction plans were prepared for the removal and replacement of 400 feet of 60” CMP through the Moultrie Trails Development in St. Augustine, Florida.