LaSalle Street Stormwater Pump Station

  • Project Type: Transportation
  • Sub-Project Type: Drainage
  • Design Year: 2023, Current
  • Client: City of Jacksonville
  • Address: Jacksonville, FL

Connelly & Wicker was part of the Haskell design-build team responsible for the design of the new storm sewer pipes along LaSalle Street and side streets within the San Marco neighborhood that will connect to a new stormwater pump station for the City of Jacksonville.  More than 6,000 LF of pipe will convey stormwater runoff to the new storm water pump station (Shown above) on LaSalle Street just east of the St. Johns River. The project required a City of Jacksonville 10-Set permit approval.