Donner Road Reconstruction

  • Project Type: Transportation
  • Sub-Project Type: Reconstruction
  • Design Year: 2020
  • Client: City of Atlantic Beach
  • Address: Atlantic Beach

Connelly & Wicker | PRIME AE was responsible for providing civil engineering services for the referenced project. The project included widener lanes, an 8-foot shared-use path for pedestrians and bicyclists, and an 8-foot fence along the southern right-of-way. In addition to the safety and connectivity improvements, there is also a new drainage system and improved water and sewer facilities. Agency coordination included site permitting with the City of Atlantic Beach.

© 2024, Connelly & Wicker, Inc.